Friday, May 8, 2026

Shallow Steps Evolution








2013





2017, trying to build-up / level-out an area for a fire circle





In Fall of 2018, the shallows were used for overwinter dock storage, while in Summertime, toddlers enjoyed the shallows protected by the big log.






October 2018, adding the mantle-stone



Slate steppingstones provided a 
tricky approach, as the concrete-filled 6" PVC pipe offered a grip. 
In fall of 2023, a 'gestalt' with railroad ties helps to visualize steps to approach the proposed 'Shallow Steps' (BTW, the unsecured upper beam DID float way with springtime flooding)









With low water in off-season, Pressure Treated 4x4s (>6' long) were imbedded with a backhoe in November 2023. This image is March 2024







First crosspieces as PT joists are attached to 4x4s




Slate pavers finally installed November 2024

High water in springtime 2025 is still a novelty