Overwinter support for the raft had a renovation in 2020, when a rear axel of a Plymouth Voyager was welded onto our existing 4x10 steel frame. (This was a re-use of Kurt’s old trailer, adapted to support the raft, which occurred in 2010.)
Just schlepping the revised contraption into the Adirondacks seemed like a major achievement.
Interval step is to flip this steel structure over (so the wheels can roll on the ground). Final step was to get the whole apparatus into the water. Fortunately, this fall’s loading of the raft for winter storage seemed less stressful than previous years.
No comments:
Post a Comment